
Full refurbishment project of a grade II listed bathhouse, following the devastating effects of a basement fire.

Fire Safety Works delivered in a fully occupied retirement home, including Fire door replacements and Fire-stopping improvements

Passive Fire safety compliance works and associated decorating works.

Large scale fire door maintenance and installation project, within a Grade II listed building.

Firestopping remediation and enhancement of fire compartmentation measures within an over 55's residential development

1300 Fire Damper Surveys and remedial works across community healthcare sites, on behalf of G4S Facilities Management Ltd.

Fire Door works and various building works, carried out in a care facility for children with brain injury.

PPM contract across 26 Schools, providing Fire Compartmentation Surveys, Fire Stopping, Fire Door Surveys, Maintenance and Installation, on behalf of G4S Facilities Management Ltd.

Full demolition and fit out of a modern greek restaurant, including Fire Doors and Firestopping

Anti-ligature bathroom, doorset and furniture installation, within a live mental health unit.

A variety of Planned and Reactive works across all East Of England Ambulance stations.

Design, remodelling and refurbishment of one of four washroom facilities within this large (1000+ pupil) infant/junior school.

Full refurbishment and reconfiguration of toilet facilities, including strip out and plumbing works.

Full design and refurbishment of the clinical staff toilet facilities, within a care and mental health unit.

Demolition and fit-out works within a live ambulance station

Large scale refurbishment of East of England Ambulance Headquarters, including Electrical work, flooring and installation of security systems.

Installation of automatic access gates and associated infrastructure, within a live car park.

Complete fit-out of warehouse space, sorting facility and shop floor.

A 16 site planned and reactive electrical works contract, including monthly functionality tests (Flick tests) and annual 3 hour drain down tests.

Replacement of over 210 wall amenity lights, and installation of column street lighting.

Emergency lighting upgrades, replacement of lights and switches, and replacement of incandescent lighting.

Complete fit-out of warehouse space, sorting facility and shop floor.

Anti-ligature bathroom, doorset and furniture installation, within a live mental health unit.

Refurbishment of existing patient washroom facilities, including anti ligature sanitary wear, electrics and fixings
Hollmark Ltd
Unit 2 Falcon Park
Luckyn Lane
Basildon
Essex
SS14 3AL
© 2026 Hollmark Ltd. All Rights Reserved.