Case study
Client Name: East London NHS Foundation Trust
Project Duration: 12 Weeks
Project Value: £120,000
Passmore Edwards is a community service providing care & on going support & intervention for people with significant mental health needs. Hollmark were appointed to undertake a full design and refurbishment of the clinical staff toilet facilities.
Embrace the changes to the specification made by management as a positive, instead of a negative. Ensure this message is relayed to the team to maintain motivation and quality.
Strip out of services, walls of existing areas, including flooring
Formation of new partition wall
Formation & structure of new cubicle
Supply & installation of Trovex cubicle panel
Install insulation throughout
Installation of new ceiling
New ventilation system
Electrical design and installation
Installation of hygienic wall cladding
Installation of sanitary ware
New LVT flooring
Decoration throughout
Build new cleaners’ cupboard
First & second fix plumbing
Install a new flat roof including a new sky light
Limited space for materials and construction of the project. Materials therefore had to be delivered ‘little & often’ on a day to day need basis Good stock control management on site and in company vehicles was important to ensure operatives did not experiencedelays due to lack of materials
Change management requests – demanding, managing client expectation
Hollmark had to adapt to the working hours to minimize noise disruption and disturbance to patients which involved early starts. Moving around the site had to be under escort only, but the client team was very cooperative in ensuring this happened on request without hindering our progress.
REFERENCE
‘I have worked with Hollmark now for more than 2 years on various size projects.
The most recent being the refurbishment of a WC. The works included a new ceiling to be installed and complete reconfiguration of current layout. I have always had a good experience with Hollmark, however on this occasion the communication between Martin the Contracts manager was second to none, especially as there were a number of change management requests during the course of the project. The end result was fantastic, and the workmanship carried out was of an exceptional standard. I look forward to working with them again.’